The City of Menlo Park has adopted a local amendment that amends §5.106.5.3 of the 2025 California Green Building Standards Code (CALGreen) (Muni Code §§12.18.120 - 12.18.150). The amended section establishes requirements for electric vehicle (EV) capable spaces and Electric Vehicles Charging Stations (EVCS) in new, additions to and alterations to existing non-residential buildings.
Please refer to Muni Code §12.18.120 through §12.18.150 for specific requirements.
Amended Table 5.106.5.3 establishes the number of EV capable and EVCS for new non-residential buildings and parking facilities and is more restrictive than the code requirements.
The power allocation method is an alternative to the requirements of Section 5.106.5.3. Amended Table 5.106.5.3.6 can be used to determine the total kVA required based on the actual total number of parking spaces. please see CALGreen section 5.106.5.3.6 for more information.
Total kVA Required in any Combinationof EV Capable3,4,5 Lower Power Level 2, Level 21,2 Or DCFC
Amended CALGreen section 5.106.5.4 establishes the required number of Level 2 EV capable and EV Ready spaces based on the affected area of work scope (Table below). Please see amended section 5.106.5.4 for full details.
Affected Area of Work Scope
1The EV space requirement is based on the required parking associated with the building where the work is being performed, inclusive of landscape reserve parking. For additions and alterations, percentages are based on the required parking for the affected area of the scope of work. 2Calculations for spaces shall be rounded up to the nearest whole number. 3The maximum number of required EV spaces and electric vehicle supply equipment (EVSE) shall not exceed the requirement for EV spaces for new construction of an equivalent development on a parcel or project site unless it is voluntary.
Building permits and general questions 650-330-6704 Email
Inspection questions Schedule online or 650-330-6767
Alternate Fridays closed