The information below describes the minimum submittal requirements for the demolition of a pool. In certain situations, additional materials may be required during plan review or prior to the issuance of the permit. All work must be designed to meet the minimum requirements of the California Building Standards Code and local amendments in effect at the time of permit application, Planning and Engineering Division requirements and the City of Menlo Park’s Municipal Code.
The City of Menlo Park only accepts on-line digital Building permit applications with digital plans and supporting documents. All applications, plans and supporting documents are to be submitted digitally through the City’s Accela permit management system using the Accela Citizen Access Portal (ACA). Please visit the Building Division’s Online service web page for information associated with how to register for an ACA account. The digital file specifications for all plans can be found on the Online services page under File specifications.
A pool demolition permit includes the removal of all or a portion of the shell and the backfilling and compaction of the backfill to grade elevation. Before the issuance of a permit for any subsequent construction activities over the existing pool location, the demolition permit shall have received an approved final inspection.
If the pool demolition permit application is associated with a project that has received a discretionary approval, the applicant is strongly encouraged to provide written documentation demonstrating compliance with all of the conditions associated with the project.
Please also note that:
Please refer to: Documents associated with a complete plan submittal for a complete description of the required submittal documents listed below.
Please include the following information in the plan set: