Demolition Permit Information
The information below is applicable to Building permit applications for the demolition of structures and pools. The requirements for a permit to demolish a structure are different from those of a pool and require separate permit submittals regardless of whether they are both on the same lot.
If the application for a Demolition permit is not associated with a project submitted to the Building Division for a Building permit, a site inspection may be required to verify the location of heritage trees on the property or adjoining properties. If there are Heritage Trees near the proposed demolition, an arborist report recommending tree protection measure may be required to be submitted for review and approval. After approval of the arborist report, a letter from the arborist who prepared the report will be required to verify the mandated tree protection measures are in place.
A demolition permit does not include the grading or excavation of the site, or the commencement of construction activities associated with the proposed improvements to the site. Separate Building permits are required for those construction activities. The demolition permit shall have received an approved final inspection prior to the issuance of a permit for any subsequent construction activities.