Menlo Park’s PRT process complies with California SB 379 requirements for issuing residential solar energy system permits to a licensed solar installation contractor. This process bypasses the standard building permit process to issue a building permit in real-time. All work must be designed to meet the minimum requirements of the California Building Standards Code and local amendments adopted by the City in effect at the time of permit application and the City of Menlo Park’s Municipal Code.
Eligible residential PV projects shall meet the following criteria:
Please note that: proposed systems that include battery ESS and EV charger installations are not eligible for the City's automated real time permit issuance at this time.
The Menlo Park Fire Protection District (MPFPD) is a separate and independent agencies from the City of Menlo Park. Depending on the scope of work for proposed projects, the MPFPD may require a permit, plan review and inspection. Please note that:
Contact the MPFPD directly at www.menlofire.org or 650-688-8400 regarding any permitting questions or requirements.
Please refer to Photovoltaic System and ESS Installation Requirements for a complete description of the required submittal documents listed below.
Site Plan - To Include ESS location, dedicated ESS disconnect location and grounding system location
Proposed Roof Plan - To Include location of existing plumbing vents which cannot be covered by the solar array
Existing Roof Section(s)
Installation Details
Electrical Plan - To include an electrical one-line drawing with wire sizes, existing bus capacity and main disconnect
SolarApp+
SolarAPP+ is short for Solar Automated Permit Processing. It is an online web portal that automates the plan review and process for issuing permits to qualified businesses or individuals installing code-compliant residential photovoltaic (PV) systems. Based on model building, electrical, and fire codes, SolarAPP+ automatically performs a compliance check based on inputs supplied by the contractor to ensure the proposed system is safe and code compliant.
Visit https://gosolarapp.org for more information.
Please visit the SolarAPP+ website for tutorials on how to register and submit a project on SolarAPP+:
Click her to register
Click here to submit
Revisions can only be made on systems that have not yet been installed.
A SolarAPP+ revision must first be completed on the SolarAPP+ website. Once the SolarAPP+ revision is approved, create a City of Menlo Park revision amendment utilizing the following steps:
Log in to your Accela Citizen Access (ACA) account
Note that the instructions above are also noted in the previously issued permit packet.
Building permits and general questions 650-330-6704 Email
Inspection questions Schedule online or 650-330-6767
Alternate Fridays closed